Misc commercial projects

dscf7164-s

In the last 12 months HGT have completed over 25 projects for Eurotunnel and are currently tendering for other projects for 2017. The type of projects have varied greatly from refurbishing washrooms, building new offices to a broad variety of civil and ground works packages.

 

Regular contractor to many large commercial clients

This image shows the ‘curtain side inspection lanes’ for Eurotunnel. HTG have improved the safety and welfare for the Eurotunnel operatives at this location by installing safety barriers, shelters washroom facilities and installed services ducts and base for CCTV towers as part of HGT Constructions contract to upgrade the CCTV ducts and chambers at Eurotunnel comprising of over 5KM of Ducts.

Flexi Plus Waiting area

As summer approached Eurotunnel required an outside dining / rest area for their Flexi Plus Clients, this involved the demolition of disused existing buildings and installation of access routes and decking area, with planting to the front to screen the area from the traffic and decking tables and chairs to provide a comfortable area for the Flexi Plus client to rest. The project needed to be completed in time for the summer holidays, so HGT installed shift work onto the project so it was built 24 hours a day and completed in time for the summer rush.

HGV inspection area

All trucks pass through the ‘curtain side’ inspection lanes, to improve facilities HGT installed, safety barriers, shelters, CCTV and Lighting towers and washroom facilities. The CCTV installation was part of a larger project where HGT proved and installed over 5 KM of ducting and chambers to facilitate the upgrading of Eurotunnel CCTV network.